Case study of reconstructed concrete road on E22 between Åkarp and Lund

Authors

  • Per Tyllgren Swedish Road Center https://orcid.org/0009-0004-1186-1663
    • Conceptualization
    • Data Curation
    • Formal Analysis
    • Funding Acquisition
    • Investigation
    • Methodology
    • Project Administration
    • Validation
    • Visualization
    • Writing – Original Draft Preparation
    • Writing – Review & Editing
  • Sven Agardh Lund University image/svg+xml
    • Conceptualization
    • Data Curation
    • Formal Analysis
    • Funding Acquisition
    • Investigation
    • Methodology
    • Validation
    • Visualization
    • Writing – Review & Editing
  • Pajtim Sulejmani Lund University image/svg+xml
    • Conceptualization
    • Funding Acquisition
    • Writing – Review & Editing
  • Joacim Lundberg Lund University image/svg+xml https://orcid.org/0000-0002-0138-0768
    • Conceptualization
    • Funding Acquisition
    • Investigation
    • Project Administration
    • Writing – Review & Editing

DOI:

https://doi.org/10.55329/xokb4172

Keywords:

case study, concrete pavement, investigation

Abstract

Sweden's first motorway between Malmö and Lund was inaugurated in 1953 and was built of concrete. Deterioration resulted in larger maintenance starting in 1979, when the concrete slabs was cracked with two asphalt layers constructed on top. Originally a wearing course of porous asphalt was selected. However, it turned out problematic and over time it was removed. The asphalt construction of about 11 cm was also shown to be too thin.

After investigations around year 2000, it was decided that the Scanian concrete motorways from the 1950s to 1978 was to receive extra funding for more extensive reconstruction. Among the first objects was a continuation of the maintinance started in 1979 on the E22 between Åkarp and Lund, which was finished in 2005.

All asphalt was removed down to old concrete in the right lane, while a layer of BG25 from 1979 was left in the left lane, 11.5% of the right lane and 3.3% of the left lane received steel mesh reinforcement. The mesh is on top of a machine leveling with ABb11. With a layer of AG 22 in the right lane, the lanes ended up at the same level. The construction was completed in both lanes with a binder course ABb22 and a wearing course ABS16, the latter with the addition of rhyolite from the province of Dalsland. The total asphalt thickness on top of the cracked concrete was approximately 20 cm.

The motorway section has not received any maintenance since the reconstruction in 2005, and the question arose as to why the section appeared to have less degradation than expected given the high traffic volume and the experience from other renovated concrete roads.

To investigate the properties and condition of the road, data was collected on materials and measurements carried out: drilled cores and testing of wear resistance against studded tyres of the wearing course, gravel compositions from the road superstructure; mechanical examination of the asphalt layers; strength tests, composition analysis, extraction of components and testing of bitumen and stone quality; ground penetration radar measurements of thickness and location of mesh reinforcement, drop weight measurement, rolling bearing capacity measurement with Raptor and sampling of the superstructure. In addition, data was collected from PMSv4.

The reason for the durability of the road since the reconstruction has several possible explanations. The foundation of over 65 cm of natural, uncrushed, stone gravel seems to have ensured sufficient bearing capacity and reduced the risk of frost problems. However, the round stones under the concrete do not seem to have been still, resulting in tilting concrete slabs. The cracking of the reinforced concrete slabs created a compliance with the surrounding layers, which seems to have counteracted reflection cracks. The total thickness of the asphalt layer captures displacements that occur due to changes in moisture and temperature between the seasons and the movements of the traffic loads without ruptures occurring. The bearing capacity measurements generally show high bearing capacity, above the guideline value for a heavily trafficked road like this. The combination of different stone materials created a durable surface structure with sufficient friction, which in combination with constant crossfall and the lack of subsidence counteracts the risk of aquaplaning.

There does not appear to be any signs of disintegration or deformation in any of the layers examined. Bitumen 70/100 without polymer modification seems to have resulted in the layers with AG and ABb having a stiffness and ductility that has withstood the loads. The wearing course with a polymermodified bitumen, 70/100-48, contains approximately 2% polymer, which appears to have ensured that the binder has sufficient ductility and adhesion to withstand the traffic loads and the aging effect.

Handleability and layability have been achieved at lower manufacturing temperatures than with high polymer contents, counteracting hardening during manufacturing. The road surface shows no visible cracks or material loss.

A possible success factor was that the professional workers were spared traffic, resulting in an safer work environment and less load on the pavement during construction.

Interviewed asphalt workers remember the materials as being particularly flexible and easy to lay. This is required to achieve good properties and long durability. The result show that manuals and guidelines need to be developed.

The conclusion of the studies carried out is that all parameters, from materials to execution, interacted to achieve the quality that the reconstruction from 2005 led to. Whether the results can be repeated on other similar road objects depends on the circumstances and any limitations that each specific work faces.

References

Aurell, O. (2018). Undersökning av asfaltbruk med olika fillersorter – Reologiska egenskaper testade med DSR. Examensarbete på Civilingenjörsnivå. Arbete 324. Lunds tekniska högskola, Lunds universitet: Lund.

Federal Aviation Administration (2024). BAKFAA 3.4.3. U.S. Department of Transportation, Federal Aviation Administration: Washington D.C, U.S.A.

Fredlund, H. (1954). Motorvägen Malmö-Lund. Teknisk Tidskrift, s. 153–162. Stockholm.

Hamidi, A., Hoff, I., och Mork, H. (2024). Elastic and viscoelastic back-calculation of pavement layers’ moduli using data obtained from traffic speed deflection devices. Norges teknisk-naturvitenskaplige universitet (NTNU): Tronheim, Norge.

Hesami, E. (2014). Characterisation and Modelling of Asphalt Mastics and Their Effect on Workability. Doktorsavhandling. KTH – Kungliga Tekniska Högskolan: Stockholm.

ISO (2019). Characterization of pavement texture by use of surface profiles. Part 1: Determination of mean profile depth. Geneva, Swtzerland: International Organization for Standardization (ISO).

Larsson, R. (2000). Lermorän – en litteraturstudie. Förekomst och geotekniska egenskaper. Varia 480. Sveriges geotekniska institut (SGI): Linköping.

Lindfors, T. (2004). Rekonstruktion av betongvägar – Väg E6 Malmö-Länsgränsen – En jämförelse mellan olika åtgärdsförslag. Uppdragsnummer 715306. Scandiaconsult Sverige AB: Malmö.

Lundberg, T., Sjögren, L., Gustafsson, M. och Ihs, A. (2011). Vägytans makrotextur och dess variation. VTI Notat 5-2011. Statens väg- och transportforskningsinstitut: Linköping.

Länsstyrelsen Skåne (u.å.). Kulturmiljöprogram: Landsvägen och första motorvägen Malmö-Lund.

Madsen, S.S., och Pederson, N.L. (2022). Comparison of RAPTOR measurements with falling weight deflectometer deflections using backcalculation. I Proceedings of the Eleventh International Conference on the Bearing Capacity of Roads, Railways and Airfields (BCRRA). Volume 3. ISBN978-1-032-12052-2.

Mollenhauer, K., Wistuba, M., och Rabe, R. (2009). Loading Frequency and Fatigue: In situ conditions & Impact on Test Results. Proceedings of 2nd Workshop on Four Point Bending. EAPA och Eurobitumen. September 24-25, Guimarães, Portugal.

Olsson, C. (2012). Förberedelser av åtgärder på skånska betongvägar. PM. Trafikverket.

Olsson, C. (2005). Provtagning och åtgärdsdiskussion på E22. Projektpärm. Vägverket.

Nielsen, B. (2005). Georadarmätning på E22 i VSK. Rapport. Ramböll Sverige AB.

Rosqvist, M. (2019). Undersökning av viskositet hos asfaltbruk – Mätningar med rotationsviskometer på bruk med olika fillersorter och mängder. Examensarbete på Högskoleingenjörsnivå. Lunds tekniska högskola, Lunds universitet: Lund.

Said, S., Carlsson, H., och Johansson, S. (2003). Stålarmering av väg E6 Ljungskile, Brattforsån-Lyckorna. VTI Notat 33-2003. Statens väg- och transportforskningsinstitut: Linköping.

Said, S., Carlsson, H., och Hakim, H. (2014). Förstärkning av vägkonstruktion med stålnätsarmering. 12 års uppföljning av väg E6 Ljungskile. VTI Rapport 820. Statens väg- och transportforskningsinstitut: Linköping.

SIS (2022a). Ballast – Mekaniska och fysikaliska egenskaper – Del 6: Bestämning av korndensitet och vattenabsorption. SS-EN 1097-6:2022. Stockholm: Svenska institutet för standarder (SIS).

SIS (2024a). Vägmaterial – Asfaltmassor – Provningsmetod – Del 2: Bestämning av kornstorleksfördelning. SS-EN 12697-2:2024. Stockholm: Svenska institutet för standarder (SIS).

SIS (2024b). Vägmaterial – Asfaltmassor – Provningsmetoder – Del 16: Bestämning av nötningsmotstånd. SS-EN 12697-16:2024. Stockholm: Svenska institutet för standarder (SIS).

SIS (2022b). Vägmaterial – Asfaltmassor – Provningsmetoder för varmblandad asfalt – Del 36: Metod för bestämning av tjocklek hos beläggningslager. SS-EN 12697-36:2022. Stockholm: Svenska institutet för standarder (SIS).

SIS (2020a). Vägmaterial – Asfaltmassor – Provningsmetoder – Del 6: Bestämning av skrymdensitet hos asfaltprovkroppar. SS-EN 12697-6:2020. Stockholm: Svenska institutet för standarder (SIS).

SIS (2020b). Vägmaterial – Asfaltmassor – Provningsmetoder – Del 1: Löslig bindemedelshalt. SS-EN 12697-1:2020. Stockholm: Svenska institutet för standarder (SIS).

SIS (2019b). Vägmaterial – Asfaltmassor – Provningsmetoder – Del 5: Bestämning av kompaktdensitet. SS-EN 12697-5:2019. Stockholm: Svenska institutet för standarder (SIS).

SIS (2019a). Vägmaterial - Asfaltmassor - Provningsmetoder - Del 3: Återvinning av bindemedel: Rotationsindunstare. SS-EN 12697-3:2019+A1:2019. Stockholm: Svenska institutet för standarder (SIS).

SIS (2015a). Bitumen och bituminösa bindemedel – Bestämning av mjukpunkt – Kula och Ring-metoden. SS-EN 1427:2015. Stockholm: Svenska institutet för standarder (SIS).

SIS (2015b). Bitumen och bituminösa bindemedel – Bestämning av penetration. SS-EN 1426:2015. Stockholm: Svenska institutet för standarder (SIS).

SIS (2014). Ballast – Mekaniska och fysikaliska egenskaper – Del 9: Bestämning av motstånd mot nötning av dubbdäck. SS-EN 1097-9:2014. Stockholm: Svenska institutet för standarder (SIS).

SIS (2017). Vägmaterial – Asfaltmassor – Provningsmetoder – Del 23: Bestämning av bituminösa provkroppars draghållfasthet. SS-EN 12697-23:2017. Stockholm: Svenska institutet för standarder (SIS).

Trafikverket (2020a). Bitumenbundna lager. Krav. TDOK 2013:0529. Version 4.0. Trafikverket: Borlänge.

Trafikverket (2026). PMSv4 E22 Åkart-Lund södra.

Trafikverket (2023). Projektspecifikation för FoI projekt ”Fallstudie av rekonstruerad betongväg på E22 mellan Åkarp – Lund” TRV 2023/33609, ID 2023-019. Trafikverket: Borlänge.

Trafikverket (2025). Undersökning av däcktyp i Sverige vintern 2025 (januari – mars). Trafikverket: Borlänge.

Trafikverket (2020b). Utvärdering av vägkonstruktioners bärighet med fallviktsapparat. TDOK 2019:0463. Version 1.0. Trafikverket: Borlänge.

Väg- och vattenbyggnadsverket (u.å). Vägbyggnad [video]. Aktiebolaget Kinematografiska Anstalten (AKAfilm).

Published

2026-03-25

Issue

Section

Report

Categories

How to Cite

Tyllgren, P., Agardh, S., Sulejmani, P., & Lundberg, J. (2026). Case study of reconstructed concrete road on E22 between Åkarp and Lund. Department of Technology and Society, Rapport 2:2026. https://doi.org/10.55329/xokb4172

Funding data